services gestion projets

Primavera Training: Project Planning and Control with Oracle Primavera®

About the Oracle Primavera training

Primavera training is intended to help you understand the process of planning and controlling projects with Oracle Primavera P6 20.1 and earlier versions.

During the course, participants are guided through the lifecycle of a project, from planning to completion. This includes: adding activities, allocating resources, saving a baseline project, as well as the basic concepts of project planning.

The terminology and principles used in this course are designed to reflect current methodologies in industrial project management practices.

Objectives
This Primavera training is structured according to project phases, combining software concepts with practical industry experience from our consultants.
  • Get an overview of the Primavera P6 app
  • Understand the main features
  • Create calendars
  • Add activities
  • Organize activities according to the project objective and change the display mode
  • Configure Oracle Primavera P6 software according to the project plan (PMBOK® Guide).
  • Add logical packaging relationships according to the technical and legal constraints of the project
  • Use table filters, view modes that will create the view for reporting and printing
  • Update project progress / Critical path analysis
  • Monitor project progress reports – S-curve analysis (Time, Scope, Cost)

We guarantee the quality of our training

Our training courses are prepared by expert, certified trainers, who are also consultants and engineers in project planning and control, with practical experience working in multiple industries.

Format
Primavera training can be taught in the classroom, in the virtual classroom (live online via the Teams app) and online.

Working method: Methodology based on practical experience of projects 20% theory and 80% practice

Virtual class-live online

The Primavera virtual classroom training is conducted live online with the trainer, via the Microsoft Teams application. With an incredibly easy-to-use interface. Our chosen Microsoft Teams platform has been designed to make online learning simple and enjoyable. Its incredible video and audio quality means you won’t miss a thing in the Primavera training.

Fully interactive

Ask questions about Primavera, share documents and communicate with your trainer and other trainees

View your trainer's screen

Your instructor can share their Primavera screen at any time to show what they are teaching.

Share documents

You can share documents with the trainer and your trainer can share schedules, reports, etc. with you.

Virtual whiteboard

Instructors can draw and share their whiteboard with the class at any time.

Structure

Part 1 (4h)
  • What is a project
  • The triple constraint of the project
  • The project life cycle according to the PMI (Project Management Institute)
  • The role of Oracle Primavera in project management
  • Quiz
  • What is Oracle Primavera P6?
  • Launch the application
  • General overview of windows
  • Understand the project and overall data
  • Structuring the project: EPS, WBS, OBS
  • Practical Project Example
  • Create a project (Course-project support)
  • View and edit project details information
  • Setting the project schedule
  • Create the WBS (Work Breakdown Structure)
  • Enter the details of the different levels of the structure
  • Set activity list
  • Estimate the duration of activities
Part 2 (4h)
  • Fill in task detail information
  • Define task steps
  • Type of links – presentation
  • Practical exercise – How to calculate the Critical Path (1h) –
  • Example of analysing activity floats
  • Create dependencies between tasks
  • Adjust links by delays
  • View and edit the logical network
  • Define task constraints
  • Show margins and critical path
Part 3 (4h)
  • Sort and group tasks
  • Add/remove a column
  • Create, modify, apply filter
  • Activity codes: definition of an alternative WBS structure
  • Customize a Gantt chart view (layout)
  • Define roles and resources in Primavera P6
  • Enter the maximum capacity of roles and resources (allocation)
  • Set resource calendar
  • Allocation of labor/non-labor resources
  • Activity settings when adding/removing resources
Part 4 (4h)
  • What are the project expenses
  • Best practices for using activity expenses
  • Assign a dummy resource
  • Top-down estimation
  • Save the project baseline to use for future comparisons
  • Saving a Basic Layout
  • Assign baseline to current project
  • Identify update interval (lighting)
  • Enter the % of activity completed (duration, physical)
  • Enter actual values for resources and costs
Part 5 (4h)
  • View the project to monitor performance
  • Identify activities that have slipped
  • Use filters
  • Analyze activity costs
  • Analyze resource costs
  • Prepare a project cost variance report
  • Analyze the S-Curve (Cost-Time-Scope) Actual vs. Planned
  • Import projects (Excel/MS Project/Primavera)
  • Export projects (Excel/MS Project/Primavera)
  • Check your knowledge

Primavera Training
Virtual Classroom (live online) via Microsoft Teams
5 days (4h/day)

Region

Price (per person)

North America / Europe1200£
Asia Pacific / Latin America650£
India / Middle East / Africa390£

 

  • Intra-company training (minimum 3 trainees from the same company – decreasing price depending on the number of participants)
  • Primavera P6 installed minimum version Primavera P6 8.3

– Presentation via the Microsoft Teams tool
– Real case study selected with participants
– Work directly in the Oracle Primavera application

– Training manual
– Planning and reporting templates
– Project planning guide

– Engineers and planners
– Project managers
– General Managers
– Financial managers
– Contracts and Claims Manager
– Project risk managers
– Document controller
– PMO support engineer
– Cost engineers

– Engineering and construction
– Oil, Gas and Petrochemicals
– Infrastructure
– Nuclear
– Electricity and water utility installations
– Manufacturing and industrial
– Government
– Aerospace
– Defense
– Financial services
– Telecommunications
– Pharmaceutical products
– Environmental
– Shipbuilding






    Classroom

    Structure

    Day 1
    • What is a project
    • The triple constraint of the project
    • The project life cycle according to the PMI (Project Management Institute)
    • The role of Oracle Primavera in project management
    • Quiz
    • What is Oracle Primavera P6?
    • Launch the application
    • General overview of windows
    • Understand the project and overall data
    • Structuring the project: EPS, WBS, OBS
    • Practical Project Example
    • Create a project (Course-project support)
    • View and edit project details information
    • Setting the project schedule
    • Create the WBS (Work Breakdown Structure)
    • Enter the details of the different levels of the structure
    • Set activity list
    • Estimate the duration of activities
    • Fill in task detail information
    • Define task steps
    • Type of links – presentation
    • Practical exercise – How to calculate the Critical Path (1h) –
    • Example of analysing activity floats
    • Create dependencies between tasks
    • Adjust links by delays
    • View and edit the logical network
    • Define task constraints
    • Show margins and critical path
    Day 2
    • Sort and group tasks
    • Add/remove a column
    • Create, modify, apply filter
    • Activity codes: definition of an alternative WBS structure
    • Customize a Gantt chart view (layout)
    • Define roles and resources in Primavera P6
    • Enter the maximum capacity of roles and resources (allocation)
    • Set resource calendar
    • Allocation of labor/non-labor resources
    • Activity settings when adding/removing resources
    • What are the project expenses
    • Best practices for using activity expenses
    • Assign a dummy resource
    • Top-down estimation
    • Save the project baseline to use for future comparisons
    • Saving a Basic Layout
    • Assign baseline to current project
    Day 3
    • Identify update interval (lighting)
    • Enter the % of activity completed (duration, physical)
    • Enter actual values for resources and costs
    • View the project to monitor performance
    • Identify activities that have slipped
    • Use filters
    • Analyze activity costs
    • Analyze resource costs
    • Prepare a project cost variance report
    • Analyze the S-Curve (Cost-Time-Scope) Actual vs. Planned
    • Import projects (Excel/MS Project/Primavera)
    • Export projects (Excel/MS Project/Primavera)
    • Check your knowledge

    Primavera Training
    Virtual Classroom (live online) via Microsoft Teams
    5 days (4h/day)

    Region

    Price (per person)

    North America / Europe1200£
    Asia Pacific / Latin America650£
    India / Middle East / Africa390£

     

    • Intra-company training (minimum 3 trainees from the same company – decreasing price depending on the number of participants)
    • Primavera P6 installed minimum version Primavera P6 8.3

    – Presentation via the Microsoft Teams tool
    – Real case study selected with participants
    – Work directly in the Oracle Primavera application

    – Training manual
    – Planning and reporting templates
    – Project planning guide

    – Engineers and planners
    – Project managers
    – General Managers
    – Financial managers
    – Contracts and Claims Manager
    – Project risk managers
    – Document controller
    – PMO support engineer
    – Cost engineers

    – Engineering and construction
    – Oil, Gas and Petrochemicals
    – Infrastructure
    – Nuclear
    – Electricity and water utility installations
    – Manufacturing and industrial
    – Government
    – Aerospace
    – Defense
    – Financial services
    – Telecommunications
    – Pharmaceutical products
    – Environmental
    – Shipbuilding






      En ligne

      in development

      They trust us

      Very good training

      Munier Killian

      FOURE LAGADEC

      Très bonne formation, pratique  

      Danut Tuchel

      DAMEN SHIPYARD

      All training topics covered, detailed explanations given with clear examples, comprehensive training documentation provided. the training method and step-by-step pedagogy are good. training program carried out in accordance with the program schedule, including additional exercises and question-and-answer exchanges on specific topics.

      JEAN NGUYEN,

      ALSTOM TRANSPORT

      Complete training with a concrete example of project planning. Lots of topics covered. Response received to all questions asked. To improve: deepen the basics before proceeding further with less used functionalities

      Chaoual

      ALSTOM

      Enriching training

      Leblond Thomas

      FOURE LAGADEC

      What you will get after Primavera training

      Training manual

      Certificate of Completion

      Case studies

      primavera p6, valeur acquise

      Templates

      Post-course support

      • Access to a local network for participants – continuous development of project management skills, provision of useful tools and information
      • Training Recommendations
      • Proven models, planning guidelines and control

      More about Oracle Primavera in our blog

      logo ecostar planin summary

      0
      +
      years of activity in project planning and reporting
      >
      0
      trained participants
      client's satisfaction
      0%

      multicultural and international experience

      0
      + millions
      cumulated value of planned projects
      PMI PMP

      Certified Project Management Consultants Project Management Institute

      Microsoft Certified Educator

      Certified Project Management Consultants Microsoft

      Microsoft Partner Network

      Member Microsoft Partner Network

      Benefits

      According to international studies on Project Management Training results, companies showed an overall performance of 26% and improvement in 8 areas of project management thanks to their project management training programs.

      • Improved stakeholder satisfaction
      • Improved schedule performance
      • Reduction in project failures
      • The increase in the awareness of risk
      • Improved budget performance
      • Improved productivity
      • Better control of the project goal
      • Human resources development

      Evaluation of Primavera training and results (training ROI)

       
      Ecostar Plan, by experienced trainers,
      formation primavera evaluates continuously and monitor training performance to demonstrate the value of the programs to the business through:
      – Program response and value
      – Learning and confidence
      – Application and implementation

      Related training

      Submit your review
      1
      2
      3
      4
      5
      Submit
           
      Cancel

      Create your own review

      Formation Primavera: Planification et contrôle de projet avec Oracle PrimaveraP6
      Average rating:  
       2 reviews
       by LEURAUD OlivierTSOResponsable Technique - Bureau d'Etude International

      Training very clear and complete.

       by URIARTE KelvinTSO Ingénieur Etudes

      Very comprehensive training. It met all my expectations. I found a good balance between theory and practice. Even though I knew a little about the software, the training showed me that I was not necessarily following good usage practices. I can see all the possibilities of the software.